Hinjewadi Phase 2 · Pune · Now selling

Three towers.
One quiet skyline
over Hinjewadi.

2, 3 & 4 BHK residences across 4.6 acres — a 40,000 sq.ft. clubhouse, a 25 m lap pool, and the Hinjewadi metro line four minutes from your gate. Homes from ₹86.4 Lakh.

3Towers
22Floors each
468Residences
Dec 2027Possession
0Acres of land
0%Open & green
0Total homes
0+Amenities
0kSq.ft. clubhouse
Modern residential towers with curved balconies and mature landscaping
2004

Vistara Group has been building in Pune for twenty-two years — 18 delivered projects, none handed over late.
Track record shown is illustrative for this demo.

The project

A high-rise that behaves
like a low-rise.

Hinjewadi grew faster than its footpaths. Vistara Heights is our answer to that: three slim towers placed at the edges of a 4.6-acre plot, so that seventy-four per cent of the ground stays open, planted and walkable.

No podium parking staring at your window. No tower shadowing another before 4 pm. Every home is a corner or a through-unit, cross-ventilated, with a deck deep enough for a chair and a cup of chai — 8 ft, not the usual 4.

01

Mivan aluminium formwork

Monolithic RCC shear-wall construction — no brick cracks, straighter walls, and roughly 30% faster slab cycles than conventional framing.

02

Only 4 homes per floor

Two lifts plus a service lift per tower, a naturally lit lobby on every level, and no shared wall between the two bedrooms of adjacent flats.

03

Zero-waste-to-landfill campus

Organic waste converter, 100% treated-water reuse for landscaping, and a 220 kWp rooftop solar array covering common-area load.

See the residences Construction progress
How buying works here

Four steps, no surprises.

Everything below happens in our Hinjewadi sales gallery or on your phone — and every number you are quoted is the number on the agreement.

1

Pick a home, live

Use the tower → floor → unit picker below. What you see is what our CRM sees — availability, facing, carpet area and the all-in price.

2

Build your payment plan

CLP, 10:90 flexi or possession-linked. The milestone table rebuilds itself against your shortlisted unit, GST and stamp duty included.

3

Block it for 7 days

₹51,000 refundable booking token holds the unit while your home-loan sanction comes through. Refunded in full if it does not.

4

Register and track

Agreement registration at our office. After that, a dated progress album for your tower lands on your WhatsApp on the 5th of every month.

The residences

Three plans. Each one
drawn around a deck.

Carpet areas are RERA carpet — the number on your agreement, not a builder's “super built-up” arithmetic. Every home gets an 8 ft deep deck off the living room.

Check availability
Compact modern living room with a sofa, work desk and armchair Tower Ambar

Type A & A12 BHK · Sky Deck

Two bedrooms, both with wardrobes cast into the wall line. Kitchen opens to a utility deck that actually fits a washing machine and a dryer.

Carpet area688 – 742 sq.ft.
Deck78 sq.ft.
Baths2
Parking1 covered
Starting at₹86.4 L
View units
Spacious living room with a large picture window and layered seating Towers Ambar & Vayu

Type B, B1 & B23 BHK · Grand Deck

The workhorse plan. A 12'6″ master with a walk-in, a study-sized third bedroom, and a living room wide enough for a nine-seater without blocking the passage.

Carpet area1,024 – 1,180 sq.ft.
Deck106 sq.ft.
Baths3
Parking1 covered
Starting at₹1.31 Cr
View units
Elegant living room with leather furniture, warm lighting and tall windows Tower Tejas

Type C & C14 BHK · Corner Estate

Corner-only. Three exposed sides, a separate family lounge, a servant room with its own WC, and a 15 ft wraparound deck facing the Marunji hills.

Carpet area1,642 – 1,720 sq.ft.
Deck184 sq.ft.
Baths4 + servant
Parking2 covered
Starting at₹2.14 Cr
View units
Live inventory

Pick your tower, floor
and exact home.

This is the same availability grid our sales team works from. Tap a tower, then a floor, then a unit — shortlist as many as you like and carry them into the payment planner.

Homes still open
0 / 468
1 Choose a tower
MARUNJI ROAD FRONTAGE — 4.6 ACRES G + 22 FLOORS
2 Floor & unit
Available Few left on this stack Sold / blocked Prices are all-inclusive of floor rise & facing premium
Handed over finished

You will not need to break a single wall.

Every home is delivered with vitrified flooring laid, a granite kitchen counter with dado, Jaquar CP fittings, a Godrej digital main-door lock and AC points already drawn to all bedrooms and the living room. Move in with furniture, not with a contractor.

8 ftDeck depth
10'6″Floor to floor
3Lifts per tower
100%DG backup, commons
Payment planner

Build the payment plan
before you talk to anyone.

Choose a scheme and the milestone table below rebuilds itself against your shortlisted home — agreement value, GST, stamp duty and registration, all in. No “plus taxes” footnote surprises.

2 Choose a scheme
Every figure here is illustrative for this demo and derived from a published base rate. The registered agreement value at booking is what governs.
MilestoneShareAmount payable
Includes 5% GST & 7% stamp duty + registration for Pune municipal limits.
Construction tracker

Drag the month.
Watch the towers rise.

Twenty-one months of dated site photography and slab-level progress, updated on the 5th of every month. Nothing here is a render.

Handover target
December 2027
Per RERA declaration · mock
Jan 2025
Excavation & raft

Site cleared, shoring complete, raft foundation poured for Tower Ambar.

January 2025
Jan 2025Nov 2025Sep 2026

Per-tower completion

Measured against the RERA-declared works schedule, verified by our third-party project management consultant.

What happened this month

Shoring and excavation completed to a depth of 4.2 m. Raft reinforcement laid for Tower Ambar; anti-termite treatment done.

Slabs cast0
Workforce0
Cement (MT)0
Thirty-one amenities

Built for the hours
between work and sleep.

The clubhouse opens the same day you get your keys — not two years later. Every amenity below is in the RERA-filed plan, not the brochure's imagination.

25 m lap pool

Heated in winter, six lanes, with a toddler shelf on the east edge.

Gym over the lake

640 sqft of glass on the second floor — cardio with a view of Hinjewadi lake.

Co-work lounge

28 seats, call booths and fibre on both towers' ground floors.

Amphitheatre lawn

Screenings on Saturdays, Garba in October, 300 people comfortably.

Kids' grove

Shaded play court with a fall-safe surface and a parents' deck beside it.

EV-ready parking

Every fourth basement bay pre-wired for a 7.4 kW home charger.

Box cricket & pickleball

Floodlit till 10 pm, bookable from the residents' app.

Rain gardens

1.8 lakh litres of recharge pits — the lawns drink the monsoon, not the drains.

Specifications

What the agreement says,
in plain language.

StructureRCC shear-wall, Zone III seismic design, Mivan formwork — no external plaster cracks to repaint every third year.
Flooring800×1600 double-charged vitrified in living and bedrooms; anti-skid ceramic in decks and baths.
KitchenGranite platform with quartz option, SS sink, piped gas riser, provision for RO and dishwasher.
Doors & windows8 ft laminated main door; UPVC three-track windows with mosquito mesh throughout.
ElectricalFire-retardant copper wiring, modular switches, AC points in every bedroom and living, EV provision in allotted parking.
BathroomsFull-height glazed tiles, CP fittings with 10-year warranty, hot-cold mixer, geyser point and ventilation.
SafetyVideo door phone, sprinklers per NBC, two service lifts + two passenger lifts per tower with V3F drives.
All-inclusive quotes

The number includes
everything except stamp duty.

Development charges, clubhouse, two parkings on the 3 BHK, GST — already inside. Stamp duty and registration are government charges; we print them separately so you can verify them.

2 BHK · 712 sqft carpet ₹72.4 L
  • Deck off the living room
  • One covered parking
  • Possession Dec 2027
Quote for 2 BHK
3 BHK · 984 sqft carpet · most chosen ₹98.9 L
  • 8 ft deck + utility deck
  • Two covered parkings
  • Corner units, two sides open
  • Possession Dec 2027
Quote for 3 BHK
3.5 BHK sky · 1,240 sqft carpet ₹1.34 Cr
  • Top three floors only
  • Deck wraps two sides
  • Two parkings + store
Quote for sky

Illustrative EMI: 3 BHK at 80% loan, 8.4%, 20 yrs ≈ ₹68,200/month. Prices indicative for this demo; RERA no. P52100000000 (sample).

Site visits, seven days a week

See the actual slab,
not just the sample flat.

Forty minutes: model apartment, the floor your unit would be on, the clubhouse shell, and the RERA documents open on a table. A car can pick you up anywhere in Pune.

Pick-up anywhere in Pune · slots 10 am / 12 / 3 / 5 pm.
Hinjewadi Phase 2, Pune

Four minutes from the
Megapolis signal.

Off the internal 24 m road — far enough that Friday traffic stays on the highway, close enough that the office is a podcast episode away.

Get the location pin
Infosys / TCS Phase 2 gates6–9 min
Metro Line 3 (u/c) station7 min
Balewadi High Street18 min
Symbiosis / MITCON12 min
Ruby Hall, Hinjawadi9 min
Pune airport55 min
Asked at every site visit

The questions that matter.

Is the project RERA registered?
Yes — both towers under a single registration, with the completion date on record as December 2027. The certificate and quarterly progress filings are on the MahaRERA portal and open on a table at every site visit.
What exactly is included in the quoted price?
Base price, development charges, clubhouse membership, GST and the parking(s) listed on the plan card. Stamp duty (~6%) and registration (₹30,000) are government charges paid at registration — we never bundle or mark them up.
Which banks have approved the project?
SBI, HDFC, ICICI and LIC HFL have project approvals, which means faster sanction on the same documents. Our loan desk sits at the site office on weekends.
What if construction is delayed?
RERA entitles you to interest at SBI MCLR +2% for every month of delay past the registered date — that clause is printed in the agreement, not negotiated later.
Can NRIs buy, and how do payments work?
Yes — through NRE/NRO accounts under RBI rules, with a PoA holder for registration if you cannot travel. Demand letters follow the RERA-linked construction schedule.